Solar GBI

 

Sl. No.  Details Remarks
1 Online Claim Submission for Solar GBI - Go Live  01-02-2024
2 User Manual of Solar GBI Claim submission (View) 01-02-2024
3 Notification: 
IREDA has launched the new Solar GBI portal under RPSSGP Scheme for claim processing. The walk through of the portal was conducted on 23rd January, 2024 in virtual mode through participation of all the DISCOMs.  The portal is Live from 1st February, 2024  and all the claims under the RPSSGP Scheme are mandatorily required to be submitted online through the portal only for further processing.    
 
IREDA has also shared the invite to all the registered users for account activation as per the details shared by the respective DISCOM/State Utility.   

All are requested to please activate the account which will enable accessing rights to proceed with the claim submission in respective project. 
 
The portal User Manual is accessible from IREDA website https://www.ireda.in

Please note that all the conditions for release of GBI remain unchanged. 
01-02-2024





A. RPSSGP Scheme

Guidelines for Rooftop and Other small solar power plants connected to distribution network (Below 33 kV) Download
Guidelines for "Rooftop PV & Small Solar Power Generation Programme" Download
Guideline for "Accelerated Depreciation" on Rooftop PV & Small Power Generation Programme under JNNSM Scheme Download
Clarification related to rooftop and small power generation programme (RPSSGP) Download
Field evaluation of solar power projects sanctioned under demonstration GBI Scheme and RPSSGP Scheme Download
Guideline for repowering and CUF of the Solar PV Power Plants installed under RPSSGP GBI Scheme of MNRE Download
Clarifications on RPSSGP scheme  


B. Demo Solar Guideline

Generation details of the Projects under RPSSGP Scheme as on 18-04-2022

Status of Commissioned Projects under RPSSGP Scheme

 

Status of Funds received from MNRE, Claims processed and Released under Solar GBI Schemes (Rs in Crores)
Schemes Receipt of Funds from MNRE Amount Released
Amount Date Amount
Demo Solar GBI 276.48 09.01.2024 269.12
RPSSGP (Solar GBI) 1461.58 09.01.2024 1473.24
 
Last Updated on 01/02/2024