Wind GBI / AD Scheme

IREDA is the implementing agency for the MNRE Scheme for Implementation of Generation Based Incentives (GBI) for Grid Interactive Wind Power Projects. The scheme covers GBI-I (2009–2012), Demo, and GBI-II Extension (2012–2017), along with the Accelerated Depreciation (AD) registration scheme applicable since 01.04.2014.

Online Application Portals
Closed
Online Application — GBI / AD Scheme for Wind (2009–2012)
GBI period under Wind GBI-I scheme was up to 31.03.2022. The portal was automatically deactivated on 01.07.2022 and no further claims are accepted.
Portal Closed
Live
Online Application — Registration of GBI / AD & Claim of GBI (2012–2017)
New ERP portal Go-Live dated 05-08-2023. Please ensure not to submit any claim for which GBI is already released or GBI has reached the maximum limit.
Access Portal
Important Notifications
Date Notification
17.12.2025 Notification on timeline for submission of financial documents under Wind GBI-II scheme — All claimants are mandatorily required to upload attested copies of all financial documents up to FY 2024-25 latest by 31st December 2025, failing which further claims will not be processed.
11.11.2024 All claimants are mandatorily required to upload attested copies of all financial documents up to FY 2023-24 latest by 31st December 2024. Also: monthly claims must be submitted within three months from the respective month (e.g. December claim latest by 31st March). GBI for non-compliant months may be treated as ZERO.
22.12.2023 Notification on timeline for monthly claim submission under Wind GBI-II scheme.
14.09.2023 Notification on Account activation in new Wind GBI portal and claim submission.
11.08.2023 All GBI beneficiaries are advised to ensure not to submit any claim for which GBI is already released or has reached the maximum limit. Submission of such claims amounts to over-claiming or false claims.
27.07.2023 Final request for sharing Email details for creating login accounts in the new Wind GBI portal. All claimants are requested to share email IDs for pending projects to avoid missing account creation and further delays.
11.04.2023 Notification to Wind GBI claimants on migration of existing portal to new ERP. The new portal is under data migration — IREDA will update the Go-Live date shortly.
18.03.2023 Methodology to calculate GBI for Wind power projects installed in Rajasthan under Wind GBI Scheme, as per MNRE directions dt. 09.03.2023: (i) Calculation of GBI without considering losses; (ii) Consideration of JMR at licensee's premises or pooling substation; (iii) Reconcile and adjust amounts released in previous claims as per JMR. IREDA shall adjust amounts earlier released against transmission loss in the next release.
09.03.2023 Updated methodology for GBI calculation for Rajasthan Wind projects per MNRE directive.
31.03.2023 Notification: Existing Wind GBI portal will be permanently deactivated after 31.03.2023 2400 hrs. New ERP is likely to go live from 10th April 2023. All claimants must upload documents in the new portal post this date.
22.08.2022 All Claimants are hereby requested to mandatorily submit OEM certificate (as per prescribed format in Guidelines) where partial project shall complete 10 years of commissioning, for assessing generation units corresponding to remaining turbine / balance GBI. Refer Annexure-B and Annexure-C of the Guidelines.
07.06.2022 Wind GBI-I closure notice: GBI period under the scheme is up to 31.03.2022. Claimants may submit eligible claims online by 30.06.2022. Portal automatically deactivated from 1st July 2022 — no claims in any form will be accepted thereafter.
06.07.2018 Notification for all Wind GBI Claimants (date 06-July-2018).
07.12.2017 Notification for all Wind GBI Claimants (date 07-Dec-2017).
16.03.2017 Notification for all Wind GBI Claimants (date 16-March-2017).
03.06.2016 Notification for all Wind GBI Claimants (date 03-June-2016).
Documents & Guidelines
Downloadable Documents
Guidelines, clarifications and supporting documents
Sr. No. Document Download
1 Operational Guidelines for Wind GBI and AD (May 26, 2010) Download
2 Operational Guidelines for Wind GBI Extension Scheme (2012–2017) Download
3 Operational Guidelines for Implementation of Registration under Accelerated Depreciation Scheme for Wind Power Projects (applicable since 01.04.2014) Download
4 Clarification for the GBI Application under Extension Wind GBI Scheme announced by MNRE Download
5 Guidelines for Submission and Processing of GBI Claims (GBI-I & II Scheme) — Revised as on 22-11-2018 Download
6 User Manual for New Wind GBI-2 Portal (28-07-2023) Download
7 Online Intimation for GBI Payments through E-mail / SMS Download
8 Notification 1 — Wind GBI Claimants (06-July-2018) Download
9 Notification 2 — Wind GBI Claimants (06-July-2018) Download
10 IREDA Bridge Loan Scheme against GBI Claims — Details Download
11 Bridge Loan Sanctioned against Wind GBI Claims Status — 2016-17 Download
12 Bridge Loan Sanctioned against Wind GBI Claims Status — 2015-16 Download
13 Bridge Loan Sanctioned against Wind GBI Claims Status — 2014-15 Download
14 Bridge Loan Disbursed to Wind GBI Claimants Status — 2016-17 Download
15 Bridge Loan Disbursed to Wind GBI Claimants Status — 2015-16 Download
16 Bridge Loan Disbursed to Wind GBI Claimants Status — 2014-15 Download
Status at a Glance
Status of Funds Received & Released under Wind GBI Schemes As on 31.03.2026
Scheme Amount (Rs. Crore)
Receipt from MNRE Disbursed to Developers
GBI-I 10,873.13 1,110.67
GBI-II 9,822.38
Demo 30.05 30.05
GBI Registration Status
Scheme Period Capacity Registered (MW)
GBI-II 01.04.2012 – 31.03.2017 11,593.5
GBI-I 17.12.2009 – 31.03.2012 2,031.38
Demo First 49 MW registered 48.9